<< Click to Display Table of Contents >> Navigation: Reports > FTTH > FTTH areas |
Using this screen totals for a DP or AP area can be consulted.
In the yellow search field you can search for the project number or dp name |
|
Export yard drilling forms. |
|
Export survey forms. |
|
View list of documents attached to this project. |
|
Show selection in geography. |
|
Export data to Excel-format. |
|
Export data to HTML-format. |
|
Export data to Word-format. |
|
View DP up to date in geography. |
|
View DP not up to date in geography. |
|
Sort the grid on the selected column. |
|
Search / Filter by selected data. |
When "Totals FTTH areas" is not checked:
Name |
Name of the DP area |
Max houses |
Maximum number of houses in the AP area. In the cable work screen to be filled in |
Number of houses |
Number of houses in the DP area present |
Projectnumber |
AP area name. The is the projectnumber (cablework) |
City |
City where the addresses are |
Trench length |
Total length of the trench in the DP. Exclusive the yard drillings |
Cable length |
Total length of the cable from DP to every home |
Drilling length |
Total length of all garden drillings in the DP |
Executor |
Performer of the DP area. This is tracked in Workon |
Plan date |
Plan date of the DP area. This is tracked in Workon |
Realisation date |
Realisation date of the DP area. This is tracked in Workon |
Ductsimport |
Date of last GPS drawing imported |
Check connectivity |
Date last DP connectivity been calculated |
Last change |
Date of last change in the DP area |
Ok |
Is the DP area up to date? A green check means that no changes have been made since the last time been calculated. A red cross means that the DP area is not been calculated after the last changes |
When "Totals FTTH areas" is checked:
Projectname |
Name of the AP area. This is the projectname or Cable work name. |
Max houses per DP |
Maximum number of houses in the AP area. In the cable work screen to be filled in |
Number of homes AP |
Number of houses present in the AP area |
Total houses DP |
Total number of homes involved in a DP area |
Total trench length DP |
Total trench length, which fall within a DP area |
Total garden drilling length DP |
Garden drilling total length of all the addresses that are located within a DP area |
Number of DPs |
Number of DPs entered in AP area |
Tube 2x14 length |
Length 2x14 duct/ tube in meters |
Tube 6x14 length |
Length 6x14 duct/ tube in meters |
2V cable length |
Length 2V cable within AP area |
96V cable length |
Length 96V cable within AP area |
Last edited: 31-10-2017