Insert/edit/delete cable work

<< Click to Display Table of Contents >>

Navigation:  Register > Cable works >

Insert/edit/delete cable work

In this screen cable works are maintained.

 

Changes in the infrastructure are recorded on a cable work (or project). When inserting or removing buildings or cables, for example, it is indicated which cable work is affected by this insertion or removal.

From this screen all changes with regard to the cable work may be subsequently confirmed, in order for those changes to be actually implemented. All changes with regard to a cable work may also be canceled from this screen.

 

You may link fibers to a cable work through the "Maintaining cable work fibers." function.

 


 

The following actions may be taken in this screen:

clip0268

With these buttons you may navigate through the cable works.

clip0950

Through the yellow input field you may search for a (part of the) project name.

clip1391

Search / filter

clip0390

Change project number

clip0392

Creates a unique project name based on the first characters of the adjacent field.

clip0391

Set selected project (cable work) as default.

clip1392

When checked, only project containing the search text will be shown.

clip0371

When checked, only non-closed project will be shown.

clip1393

Set the type of project.

 

These actions may be taken within the selected cable work:

clip0393,clip1394

Through this button the position of the cable work is displayed in the geography screen.

clip0394

Display the cables/project data of the cable work in the geography.

clip0395

Display the history of the cable work, together with all geographical project information, in the geography.

clip0396

Hide the history of the cable work in the geography.

clip0400

With this button you can create a GIF-file with the produced splice scheme in geography for all enclosures in the selected project that need splicing.

clip0399

Accept all project documents.

clip0398

View managed documents.

clip0415

Hide the cables/project data of the cable work in the geography.

 

clip1395

Accept the changes.

clip1396

Cancel any changes and close the screen.

clip0369

With this, you create a new cable work. This field provides a unique identification of the cable work.

Afbeeldingen_warning

The value of this field may only be entered if you submit a new cable work.

clip1397

The currently selected cable work is accepted. Before the cable work is accepted, objects are checked on status. If there any objects non-confirmed objects, the cable work may not be accepted.

First, you need to confirm these objects yourself through the clip0402 button.

clip1398

With this, you remove the current cable work. Before the cable work is removed a check will be performed to ascertain whether there are still non-confirmed objects at the cable work.
Should this be the case the cable work cannot be removed. First, you need to confirm these objects yourself through the clip0402 button.

Afbeeldingen_warning

All fibers associated with this cable work will no longer be associated with the cable work after the removal of the cable work.

clip0404

The export files for this cable work are created with this.

In the Projects sub-directory, within the Cocon directory, a new directory is created with the cable work ID as its name. A number of Excel files will be stored in this directory, together containing all associated objects with this cable work. As soon as the files are created a back-up of the files is stored in the back-up directory.

There are separate Excel files for Locations, Cables, Patches, Frames, and Splices.

At Frames, an Excel file is created for every combination of Frame name and Frame number, with Locationname_Framename_Framenumber as its name.

At Splices, an Excel file is created for every enclosure, with the name of the enclosure as its name.

 

By selecting the check-box the involved connections will be presented in an Excel sheet. The connections which are presented are changes in, patch- and splice units, enclosures, new fibers and fibers to delete.

clip0402

With this, all objects associated with this cable work are confirmed. The processing of this confirmation takes place in the Confirm/cancel project screen.

clip0405

With this, all objects associated with this cable work are canceled. The processing of this cancellation takes place in the Confirm/cancel project screen.

clip1399

With this, all object associated with this cabled work are show and any sub-status may be changed.

clip0406

Display all involved components of the cable network. Objects that are already confirmed are also displayed in this non-geographical screen.

clip0407

With this button the directory containing the Excel files is opened in the Windows explorer.

clip0408

Save all geographical project information in the history.

Afbeeldingen_frmMap10

This option allows you to switch via the cable work screen to the label request menu.
If the user is allowed to apply changes in the project, the button for label request will become active. The project number will also be copied to the label request screen.

clip0410

Find all possible permits that need to be requested. In the screen"Report possible necessary permits" all possible permits are mentioned.

clip0411

Open 'outages' screen

clip1400,clip1401

Filter the cable works on the e-mail address. Only projects with the same address will be shown, once the filter has been set. 
You can use the navigation arrows on the top of the screen to navigate through the cable works.

clip1402

By checking this field, the project will be considered as closed.

clip1403

Erase the field "Default install company".

clip0412

By entering an object name all object names meeting the criteria are searched in all cable works.

 

clip1404

Undo an import.

 


 

There are five tabs on this screen, where you may process the following information:

 

Tab 1 General

In this tab progress in recorded on the cable work, based on fives actions for which a date may be sett, aswell as a checkboxes for signing off the completed action.

 

Projectdirectory

The project's documents are stored here.

 

Projectowner

Here you can indicate who the owner of the project is. Only the person mentioned here and the contact persons may make changes in this project.

 

Cable work status

At the cable work status the following values may be entered:

 

No mutations

No mutations may be applied to the fibers associated with the cable work.

Report mutations, introduction blocked

Mutations are reported to the contact person, only introductions are blocked.

Mutations are reported

Mutations are reported to the contact person.

Mutations allowed

All changes are allowed and will not be reported to the contact person.

 

Default installation company & installation date:

It is possible to import a default installation company and installation date. When importing new objects these details, if filled in, will remain. This also applies when the project number of an object is changed. With a default installation date these values are not taken into consideration when the field is checked.

 

 
 

Tab 2 Contacts

In the second tab you may add additional contacts for the cable work. These will also be shown on the export (Tab general). They are also allowed to make changes in the cable work.

 

Contact 1
Contact 2
External contact

Alle mutaties op een kabelwerk zullen ook naar dit adres gemaild worden.
All mutations on the cable work will also be sent by email to their addresses.

clip0171,clip0173

Filter the cable works on the e-mail address. Only projects with the same address will be shown, once the filter has been set. 
You can use the navigation arrows on the top of the screen to navigate through the cable works.

clip0174

Erase the field

clip0176

In these fields you may changes the headers of the grid's columns. This button resets the headers to their default values.

clip0177

Add a new record. This may also be done by using the "insert" button on your keyboard.

clip0178

Remove a record. This may also be done by using the "delete" button on your keyboard.

 

 

Tab 3 File Selection

The third tab allows you to specify which export files there should be made. At the first time you must confirm your settings. In the check-box on the bottom of the screen you can confirm these settings.

The settings as the user makes are stored for that user only.

 

 

Tab 4 Other

In the fourth tab are two grids. In this grid you can adjust the header and the other fields to your own wishes. Each project can be set as standard (default), which can be configured by an administrator. For every project where no own values are set (the default is per project writable)  the column headers will be stored as set by the administrator.

 

 

 


Last edited: 06-10-2017